The asphalt was failing and experiencing water ingress. Due to the saturation of the existing substrate we proposed using a Flag Soprema single ply membrane which would allow the water to permeate over time whilst maintaining a 100% waterproofing. Our in-house designer had the difficult task of designing a perimeter capping to the building which included a cylindrical area as well as a pitched octagon.